SSC CGL Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge
← Back
Pretend B ran all T minutes, then remove its last 5: T/20 + (T − 5)/30 = 1 → 3T + 2T − 10 = 60 → T = 14 minutes.
₹399 →
SSC CGL Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge – 10 questions, subject: Quantitative Aptitude. Every question has the correct answer with a one-line explanation; tap "Show Answer". Free practice for TNPSC, UPSC, SSC, Bank and RRB exams – Shanmugam IAS Academy, Coimbatore.
Get daily current affairs & exam alerts – follow us
YouTube
WhatsApp Channel
Telegram Channel
Facebook Page
Instagram
Share with friends & study groups
Link to this page from your website / blog (HTML code)
1.
A can do a job in 12 days and B in 16 days. With the help of C they finish it in 4 days and are paid ₹ 3,600. What is C's share?
Correct Answer: A [₹ 1,500]
Explanation:
LCM 48: team 12/day, A 4, B 3 → C 5/day; in 4 days C does 20 of 48 units → 20/48 × 3,600 = 1,500.
2.
Pipes A and B can fill a tank in 12 and 15 minutes respectively. Both are opened together, but B is closed after 3 minutes. In how long is the tank filled in all?
Correct Answer: C [9 min 36 s]
Explanation:
LCM 60: A 5, B 4 → 3 min give 27; 33 left at 5/min = 6.6 min → 9.6 min = 9 min 36 s.
3.
30 men can finish a work in 40 days. After 10 days, 10 more men join. In how many more days will the work be finished?
Correct Answer: D [22½ days]
Explanation:
Work 1,200 man-days; 300 done; 900 ÷ 40 men = 22½ days.
4.
A is 40% more efficient than B. Together they finish a job in 35 days. How long would A alone take?
Correct Answer: C [60 days]
Explanation:
Rates 7 : 5 → 12 × 35 = 420 units → A = 420/7 = 60 days.
5.
Odd one outThree of these pairs finish a job together in exactly 10 days. Which pair does not?
Correct Answer: B [A 18 days and B 24 days]
Explanation:
18 × 24/42 = 10²⁄₇ days; the others give 10.
6.
Arrange in orderPipes P and Q fill a tank in 6 h and 9 h; pipe R empties it in 12 h. Arrange in increasing order the times to fill the empty tank with (i) P and Q open, (ii) P and R open, (iii) Q and R open.
Correct Answer: A [(i) < (ii) < (iii)]
Explanation:
(i) 3.6 h, (ii) 12 h, (iii) 36 h.
7.
Two pipes fill a tank in 10 h and 15 h, and a third pipe empties it in 6 h. All three are opened when the tank is half full. What happens?
Correct Answer: C [The water level does not change]
Explanation:
LCM 30: +3 +2 −5 = 0 → net rate zero, the level stays where it is.
8.
4 men and 6 women can finish a job in 8 days, while 3 men and 7 women can finish it in 10 days. In how many days can 10 women finish it?
Correct Answer: B [40 days]
Explanation:
Solving 4m + 6w = 1/8 and 3m + 7w = 1/10 gives w = 1/400 → 10 women do 1/40 a day → 40 days.
9.
A leak can empty a full tank in 6 hours. A tap letting in 4 litres a minute is opened, and the tank (full at the start) now empties in 8 hours. What is the capacity of the tank?
Correct Answer: A [5,760 litres]
Explanation:
The tap supplies 1/6 − 1/8 = 1/24 of the tank per hour = 240 L per hour → capacity = 240 × 24 = 5,760 L.
10.
Pipes A and B fill a tank in 20 minutes and 30 minutes. Both are opened together, but B is closed 5 minutes before the tank is full. How long does it take to fill the tank?
Correct Answer: D [14 minutes]
Explanation:
Pretend B ran all T minutes, then remove its last 5: T/20 + (T − 5)/30 = 1 → 3T + 2T − 10 = 60 → T = 14 minutes.
➤ Full notes, shortcuts and every answer explained – SSC CGL 2026 Quantitative Aptitude book (₹149): www.shanmugamiasacademy.in/study-materials/ssc-cgl-quantitative-aptitude
📘 TNPSC திறனறிவும் மனக்கணக்கு நுண்ணறிவும் (Aptitude & Mental Ability) – முழுமையான பாடநூல்
Here you get the answer with a one-line explanation. TNPSC திறனறிவு & காரணவியல் சிலபஸ் முழுவதும் · 14 அத்தியாயங்கள் + 2 அலகு மாதிரித் தேர்வுகள் · 357 பயிற்சி வினாக்கள் படிப்படியான தீர்வுடன் · மாதிரித் தாள்கள் (50 வினாக்கள்) · 14 மனவரைபடங்கள் · சூத்திரச் சுருக்கம், கணக்கு அட்டவணைகள்
Get the book – ₹199 More quizzes
› SSC CGL Quant – Mock Test M3 – Tier II Mathematical Abilities – Mock M3 · Tier II · Mathematical Abilities
› SSC CGL Quant – Mock Test M2 – Tier I Quantitative Aptitude – Mock M2 · Tier I · Quantitative Aptitude
› SSC CGL Quant – Mock Test M1 – Tier I Quantitative Aptitude – Mock M1 · Tier I · Quantitative Aptitude
› SSC CGL Quant – Speed Rounds – Tier II Level · Speed Round 5 · Marathon
› SSC CGL Quant – Speed Rounds – Tier II Level · Speed Round 4 · Marathon
› SSC CGL Quant – Speed Rounds – Level 3 · Speed Round 3 · Tier I Challenge
Score: 0
Answered: 0 / 0
