Over 65 lakh households under PM Surya Ghar; target 1 crore
3 November 2026 · English Infrastructure & Energy
⬇ Download this article as free PDF
Topics: Energy · 3 November 2026 Current Affairs (UPSC / TNPSC / SSC / RRB)
News
PM Narendra Modi inaugurated the 'Bharat Renewable Energy Summit & Expo 2026' at Bharat Mandapam, New Delhi, on 2 Nov 2026 (held alongside the 9th Assembly of the International Solar Alliance). He said over 65 lakh households have joined the 'PM Surya Ghar: Muft Bijli Yojana' – launched in Feb 2024 with a target of 1 crore homes – in about two years, with about 1 lakh new homes added every six days. He added that the 'PM Surya Sarovar Yojana', which puts solar panels on reservoirs, ponds and lakes, saves land-acquisition costs. (Note: Surya Sarovar is not new – the Union Cabinet approved it on 31 July 2026.)
Key facts
| Surya Sarovar approval | Union Cabinet, 31 July 2026; outlay ₹5,070 crore; ministry – MNRE |
| Target | About 5,000 MW floating solar + at least 2-hour storage (about 10,000 MWh in all) |
| Central aid | ₹1 crore per MW after commissioning; up to ₹50 lakh per project for feasibility studies; sanctions 2026–27 to 2030–31 |
| India's potential | About 102 GWp (NISE assessment, June 2026); leading States include Maharashtra, MP |
| Surya Ghar | Feb 2024; target 1 crore homes; 65 lakh+ by Nov 2026 |
| Non-fossil capacity | Over 50% of installed capacity; nearly 300 GW achieved towards the 500 GW target (PMO) |
Background
- Science: water cools floating solar panels and raises their efficiency (solar cells lose efficiency as they heat up); shading the reservoir also cuts evaporation. But the upfront cost is higher than for land-based solar.
- Geography: the Omkareshwar floating solar park – on the Narmada reservoir, Khandwa district, Madhya Pradesh; planned capacity 600 MW, of which the 278 MW first phase was launched by the PM on 25 Dec 2024. NTPC's 100 MW floating plant at Ramagundam (Telangana) has been in commercial operation since 1 July 2022.
- Economy: the COP-26 pledge is 500 GW of non-fossil capacity by 2030. India met its Paris goal of half its installed capacity from non-fossil sources in 2025, five years early. The PM announced a new goal of adding another 500 GW over the next 10–11 years.
- Schemes: PM-KUSUM has given solar irrigation to over 30 lakh farmers; over 44,000 government buildings run on solar power (saving about ₹700 crore a year).
Tamil Nadu link: Tamil Nadu Green Energy Corporation Ltd (TNGECL) has planned the State's first floating solar pilots at seven sites – including Mettur, Bhavanisagar and Vaigai dams, Red Hills (Puzhal) lake, Sathanur dam and a TNGECL site at Avalanche – about 100 MW in the first phase. The State's potential is estimated at about 3,000 MW across 57 reservoirs (Apr 2026).
Source: PM India (PMO), DD News, 2 Nov 2026; Deccan Herald, News On AIR, 31 July 2026 (Surya Sarovar); Renewable Watch (NISE report, June 2026; Ramagundam, 2022); Lokmat Times (TNGECL, 28 Apr 2026)
Join our UPSC classroom or online batch: UPSC coaching in Coimbatore · Fees · Call 99941 46662.
Prepared by the Shanmugam IAS Academy faculty team, Coimbatore (since 2006) · independently checked against primary sources · Our editorial policy
Add us as a preferred source on Google
Link to this page from your website / blog (HTML code)
TNPSC Achievers
-
B. SENTHIL KUMAR
TNPSC TNPSC
நடப்பு நிகழ்வுகள் 24 நவம்பர் 2026 | Today Current Affairs in Tamil | TNPSC Group 4 வினா விடை
📚 TNPSC குரூப் 4 / 2 / 2A – பொதுத்தமிழ், பொது அறிவு நூல்கள்
PDF நூல்கள் · ₹149 முதல் · ஒவ்வொன்றுக்கும் 50 பக்க இலவச மாதிரி · UPI-இல் பணம் செலுத்தியதும் உடனே பதிவிறக்கம்
பொதுத் தமிழ் — முழுமையான கையேடு (TNPSC குரூப் 2 · 2A · 4)
₹199
TNPSC முழுமையான பாடநூல்கள் – முழுத் தொகுப்பு (9 நூல்கள்)
₹1599
TNPSC குரூப் 4 பொதுத் தமிழ் – முழுமையான தேர்வுக் களஞ்சியம் 2026
₹249
பொதுத் தமிழ் — முந்தைய ஆண்டு வினா – விடை – விளக்கம் (புதிய பாடத்திட்டம்)
₹199TNPSC குரூப் 1, 2/2A, 4 – நேரடி வகுப்புகள் · கோவை & மதுரை
2006 முதல் சண்முகம் IAS அகாடமி · Classroom & online coaching in Coimbatore and Madurai
