SSC CGL Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge
SSC CGL Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge – 10 questions, subject: Quantitative Aptitude. Every question has the correct answer with a two-line explanation; tap "Show Answer". Free practice for TNPSC, UPSC, SSC, Bank and RRB exams – Shanmugam IAS Academy, Coimbatore.
Link to this page from your website / blog (HTML code)
Correct Answer: A [₹ 1,500]
Explanation:
Taking the job as 48 units, the three together do 12 units a day, A does 4 and B 3, so C does 5 units a day. In 4 days C does 20 of the 48 units, so C's share is 20/48 × ₹3,600 = ₹1,500.
Correct Answer: C [9 min 36 s]
Explanation:
Taking the tank as 60 units, A fills 5 and B 4 units a minute, so in 3 minutes together they fill 27 units. The remaining 33 units by A alone take 33 ÷ 5 = 6.6 minutes, so the total is 9.6 minutes = 9 min 36 s.
Correct Answer: D [22½ days]
Explanation:
The whole work is 30 × 40 = 1,200 man-days, and 30 × 10 = 300 man-days are done in the first 10 days. The remaining 900 man-days with 40 men take 900 ÷ 40 = 22½ more days.
Correct Answer: C [60 days]
Explanation:
A being 40% more efficient means the rates are A : B = 7 : 5, so together they do 12 units a day and the job is 12 × 35 = 420 units. A alone needs 420 ÷ 7 = 60 days.
Correct Answer: B [A 18 days and B 24 days]
Explanation:
Time together = ab ÷ (a + b): 15 × 30 ÷ 45 = 10, 12 × 60 ÷ 72 = 10 and 20 × 20 ÷ 40 = 10 days. But 18 × 24 ÷ 42 = 432/42 = 10²⁄₇ days, so the pair 18 and 24 is the odd one.
Correct Answer: A [(i) < (ii) < (iii)]
Explanation:
(i) P and Q fill 1/6 + 1/9 = 5/18 per hour, so 3.6 h; (ii) P and R fill 1/6 − 1/12 = 1/12 per hour, so 12 h. (iii) Q and R fill 1/9 − 1/12 = 1/36 per hour, so 36 h, giving the order (i) < (ii) < (iii).
Correct Answer: C [The water level does not change]
Explanation:
Taking the tank as 30 units, the two filling pipes add 3 and 2 units an hour and the emptying pipe removes 5 units an hour. The net rate is 3 + 2 − 5 = 0, so the water level stays at half full.
Correct Answer: B [40 days]
Explanation:
8(4m + 6w) = 10(3m + 7w) gives 32m + 48w = 30m + 70w, so 2m = 22w and one man = 11 women. The work is 8 × (44 + 6) = 400 woman-days, so 10 women need 400 ÷ 10 = 40 days.
Correct Answer: A [5,760 litres]
Explanation:
The leak removes 1/6 of the tank per hour, but with the tap open the net loss is 1/8, so the tap adds 1/6 − 1/8 = 1/24 of the tank per hour. The tap gives 4 × 60 = 240 litres an hour, so the capacity is 240 × 24 = 5,760 litres.
Correct Answer: D [14 minutes]
Explanation:
Pretend B ran all T minutes, then remove its last 5: T/20 + (T − 5)/30 = 1 → 3T + 2T − 10 = 60 → T = 14 minutes.
➤ Full notes, shortcuts and every answer explained – SSC CGL 2026 Quantitative Aptitude book (₹149): www.shanmugamiasacademy.in/study-materials/ssc-cgl-quantitative-aptitude
நடப்பு நிகழ்வுகள் 25 நவம்பர் 2026 | Today Current Affairs in Tamil | TNPSC Group 4 வினா விடை
📚 SSC CGL 2026 Books
PDF நூல்கள் · ₹149 முதல் · ஒவ்வொன்றுக்கும் 50 பக்க இலவச மாதிரி · UPI-இல் பணம் செலுத்தியதும் உடனே பதிவிறக்கம்
SSC CGL 2026 – Statistics (Tier II Paper II)
₹149
SSC CGL 2026 – Full Mock Test Papers (Tier I + Tier II – 38 Full Mock Papers)
₹149
SSC CGL 2026 – Quantitative Aptitude (Tier I + Tier II)
₹149
SSC CGL 2026 – General Intelligence & Reasoning (Tier I + Tier II)
₹149TNPSC குரூப் 1, 2/2A, 4 – நேரடி வகுப்புகள் · கோவை & மதுரை
2006 முதல் சண்முகம் IAS அகாடமி · Classroom & online coaching in Coimbatore and Madurai