SSC CGL Quant – Time & Work, Pipes & Cisterns – Tier II Level · Marathon
SSC CGL Quant – Time & Work, Pipes & Cisterns – Tier II Level · Marathon – 10 questions, subject: Quantitative Aptitude. Every question has the correct answer with a two-line explanation; tap "Show Answer". Free practice for TNPSC, UPSC, SSC, Bank and RRB exams – Shanmugam IAS Academy, Coimbatore.
Link to this page from your website / blog (HTML code)
Correct Answer: B [10¼ days]
Explanation:
Taking total work 36 units, A does 4 and B 3 units a day, so 5 two-day cycles (10 days) complete 35 units. On day 11 A does the last 1 unit in 1/4 day, so the work ends in 10¼ days.
Correct Answer: C [10⅓ days]
Explanation:
Taking total work 36 units, A does 4 and B 3 units a day, so every two days give 7 units and 10 days give 35 units. On day 11 it is B's turn, and B does the last 1 unit in 1/3 day, so the work ends in 10⅓ days.
Correct Answer: A [5 hours]
Explanation:
Taking the tank as 12 units, A fills 2 units an hour and B 3 units, so each 2-hour cycle fills 5 units. After 2 cycles (4 hours) 10 units are filled, and in the 5th hour A adds the last 2 units, so the tank is full in exactly 5 hours.
Correct Answer: D [14 days]
Explanation:
Taking total work 60 units, A does 3 units a day and B 2, so in the first 5 days A alone does 15 units. The remaining 45 units at 5 units a day take 9 days, so the work is finished in 5 + 9 = 14 days.
Correct Answer: D [5 days]
Explanation:
Taking total work 36 units, A, B and C do 4, 3 and 1 units a day. If the work takes D days, A and B work all D days and C works D − 4 days: 7D + (D − 4) = 36 gives D = 5 days.
Correct Answer: A [18 days]
Explanation:
Take the job as 24 units, so A does 1 unit a day and finishes 6 units in the first 6 days. The remaining 18 units at 1.5 units a day take 12 days, so the job is finished in 6 + 12 = 18 days.
Correct Answer: C [10 days]
Explanation:
Work per metre is (10 × 6 × 12) ÷ 240 = 3 man-hours, so a 400 m trench needs 1,200 man-hours. With 15 men × 8 hours = 120 man-hours a day, it takes 1,200 ÷ 120 = 10 days.
I. If A and B together take T days, each of them alone takes more than T days.
II. If A and B each take 10 days alone, working on alternate days they finish in 10 days.
III. A leak that makes a pipe of a hours take b hours empties a full tank in ab/(b − a) hours.
Correct Answer: B [All three]
Explanation:
I: rates are positive. II: each day does 1/10 → 10 days.
Correct Answer: D [₹ 1,800]
Explanation:
LCM 30: A 3, B 2. A worked 3 days = 9 units of 30 → 9/30 × 6,000 = 1,800.
Correct Answer: B [12 hours]
Explanation:
Normally the second half takes 2 h; it took 3 h → net 1/6 per hour.
➤ Full notes, shortcuts and every answer explained – SSC CGL 2026 Quantitative Aptitude book (₹149): www.shanmugamiasacademy.in/study-materials/ssc-cgl-quantitative-aptitude
நடப்பு நிகழ்வுகள் 25 நவம்பர் 2026 | Today Current Affairs in Tamil | TNPSC Group 4 வினா விடை
📚 SSC CGL 2026 Books
PDF நூல்கள் · ₹149 முதல் · ஒவ்வொன்றுக்கும் 50 பக்க இலவச மாதிரி · UPI-இல் பணம் செலுத்தியதும் உடனே பதிவிறக்கம்
SSC CGL 2026 – Statistics (Tier II Paper II)
₹149
SSC CGL 2026 – Full Mock Test Papers (Tier I + Tier II – 38 Full Mock Papers)
₹149
SSC CGL 2026 – Quantitative Aptitude (Tier I + Tier II)
₹149
SSC CGL 2026 – General Intelligence & Reasoning (Tier I + Tier II)
₹149TNPSC குரூப் 1, 2/2A, 4 – நேரடி வகுப்புகள் · கோவை & மதுரை
2006 முதல் சண்முகம் IAS அகாடமி · Classroom & online coaching in Coimbatore and Madurai