1.  

A, B and C can do a job alone in 10, 12 and 15 days respectively. Working together, they finish it in:

Correct Answer: A [4 days]

Explanation:

Take the job as 60 units (LCM of 10, 12 and 15); A, B and C do 6 + 5 + 4 = 15 units a day, so they finish in 60 ÷ 15 = 4 days. Working together they must be faster than the fastest worker alone (10 days), so only 4 days fits.

2.  

If 10 men take 12 days, 15 equally efficient men take:

Correct Answer: B [8 days]

Explanation:

Man-days are fixed: 10 × 12 = 120 man-days, so 15 men need 120 ÷ 15 = 8 days. More men means fewer days, so the answer must be below 12, which rules out 18 days.

3.  

The daily rate of a worker who finishes a job in 8 days is:

Correct Answer: C [1/8 of the job]

Explanation:

A worker who finishes a job in 8 days at a steady rate does 1/8 of the job each day. In general, if a job takes n days, the daily rate is 1/n, and rates of different workers can be added.

4.  

12 men working 8 hours a day finish a job in 15 days. Working 6 hours a day, 20 equally efficient men will finish it in:

Correct Answer: D [12 days]

Explanation:

Total work in man-hours is fixed: 12 × 8 × 15 = 1,440 = 20 × 6 × D, so D = 1,440 ÷ 120 = 12 days. More men speed the job up but fewer hours a day slow it, so both changes must be applied together.

5.  

A store of grain lasts 30 days. If daily use is cut by 20 per cent, the store will last:

Correct Answer: B [37.5 days]

Explanation:

The total store (daily use × days) is fixed, so cutting daily use to 80 per cent makes it last 30 × 100/80 = 37.5 days. Adding 20 per cent to 30 days (36 days) is the tempting error, because a 20 per cent cut in use means a 25 per cent rise in days.

6.  

A and B can do a job alone in 8 and 24 days. They do it together and are paid ₹6,000. A's share is:

Correct Answer: B [₹4,500]

Explanation:

A's rate is 1/8 and B's is 1/24 of the job a day, a ratio of 3 : 1, so A gets 3/4 of ₹6,000 = ₹4,500. Wages for a shared job are always divided in the ratio of the work each person does.

7.  

If one-fourth of a job takes 10 days, the whole job takes:

Correct Answer: C [40 days]

Explanation:

If one-fourth of the job takes 10 days, the whole job at the same rate takes 10 × 4 = 40 days (that is, 10 ÷ 1/4). Multiplying 10 by 1/4 instead gives 2.5 days, which is the tempting wrong option.

8.  

For workers taking 8, 16 and 12 days, the LCM-units method takes the job as:

Correct Answer: D [48 units]

Explanation:

48 is the LCM of 8, 16 and 12, the smallest number of units divisible by all three. The daily rates then become whole numbers: 48/8 = 6, 48/16 = 3 and 48/12 = 4 units.

9.  

A penalty of ₹100 for the first day of delay rises by ₹20 on each later day. For a delay of 8 days the total penalty is:

Correct Answer: A [₹1,360]

Explanation:

The penalties form an arithmetic series 100, 120, …, with the 8th day costing 100 + 7 × 20 = ₹240. The total is 8/2 × (100 + 240) = ₹1,360.

10.  

Consider the following statements:

1. Rates add when people work together.
2. Times add when people work together.
3. Man-days are constant for a fixed job if all workers are equally efficient.

Which of the statements given above is/are correct?

Correct Answer: B [1 and 3 only]

Explanation:

When people work together their rates add, and with equally efficient workers the man-days for a fixed job stay constant (M₁D₁ = M₂D₂), so statements 1 and 3 are correct. Statement 2 is wrong because times do not add; working together shortens the time.

11.  

Assertion (A): If 4 men or 6 women can do a job in 12 days, then 2 men and 3 women working together also finish it in 12 days. Reason (R): Here one man does as much work as 1.5 women, so 2 men and 3 women equal 4 men.

Correct Answer: A [Both A and R are true, and R is the correct explanation of A]

Explanation:

Since 4 men = 6 women in work, one man equals 1.5 women, so 3 women do the work of 2 men. The team of 2 men and 3 women equals 4 men, who take 12 days, so R explains A.

12.  

A can do a job in 15 days and B in 10 days. They work together for 3 days, and then A leaves. In how many more days does B finish the job?

Correct Answer: C [5]

Explanation:

Together they do 1/15 + 1/10 = 1/6 of the job a day, so in 3 days they finish half. B alone (1/10 a day) needs 5 more days for the other half.

13.  

Pipe A can fill a tank in 24 minutes and pipe B in 36 minutes. Both are opened together, and after 8 minutes pipe A is closed. How long does it take to fill the tank in all?

Correct Answer: D [24 minutes]

Explanation:

In the first 8 minutes both pipes fill 8/24 + 8/36 = 1/3 + 2/9 = 5/9 of the tank. B fills the remaining 4/9 in 4/9 × 36 = 16 minutes, so 8 + 16 = 24 minutes in all.

14.  

A can do a job in 15 days. A works for 5 days, and B then finishes the rest of the job in 12 days. B alone would do the whole job in:

Correct Answer: D [18 days]

Explanation:

In 5 days A does 5/15 = 1/3 of the job, so B does the remaining 2/3 in 12 days. B alone would take 12 ÷ (2/3) = 18 days.

15.  

B is 25 per cent more efficient than A, who needs 20 days to finish a job. B alone will need:

Correct Answer: C [16 days]

Explanation:

A does 1/20 of the job a day, and B, 25% more efficient, does 1.25 × 1/20 = 1/16 a day. So B alone needs 16 days, not 15 (which would be 25% less time).

16.  

A can do a job in 6 days, B in 12 days and C in 24 days. Arrange the following in increasing order of the time taken to do the job:

1. A alone
2. B alone
3. A and B together
4. B and C together

Select the correct answer using the code given below:

Correct Answer: B [3-1-4-2]

Explanation:

A and B together take 1 ÷ (1/6 + 1/12) = 4 days, and B and C together take 1 ÷ (1/12 + 1/24) = 8 days, while A alone takes 6 and B alone 12. In increasing order 4, 6, 8, 12 gives 3-1-4-2.

17.  

A pipe fills a tank in 10 hours and a leak empties it in 15 hours. Together the tank fills in:

Correct Answer: D [30 hours]

Explanation:

The net filling rate is 1/10 − 1/15 = 3/30 − 2/30 = 1/30 of the tank per hour. So with the leak open, the tank fills in 30 hours.

18.  

X takes 6 hours and Y 8 hours for a job. One hour of X followed by one hour of Y completes:

Correct Answer: A [7/24 of the job]

Explanation:

X does 1/6 of the job in one hour and Y does 1/8 in one hour. Together the two hours complete 1/6 + 1/8 = 4/24 + 3/24 = 7/24 of the job.

19.  

20 men can build a wall in 12 days. They work together for 4 days, after which 4 men leave. The remaining work is finished in:

Correct Answer: B [10 days]

Explanation:

The wall needs 20 × 12 = 240 man-days, and 20 × 4 = 80 are done in 4 days, leaving 160. The remaining 16 men need 160 ÷ 16 = 10 days.

20.  

A can do a job in 12 days and B in 24 days. Working together they finish it in:

Correct Answer: A [8 days]

Explanation:

Together they do 1/12 + 1/24 = 3/24 = 1/8 of the job per day. Hence they finish the job in 8 days.

21.  
UPSC Prelims (CSAT) 2015

Two pipes A and B can independently fill a tank completely in 20 and 30 minutes, respectively. If both the pipes are opened simultaneously, how much time will they take to fill the tank completely?

Correct Answer: B [12 minutes]

Explanation:

Together the pipes fill 1/20 + 1/30 = 5/60 = 1/12 of the tank per minute. So they fill the tank completely in 12 minutes, which is the product over sum 20 × 30 ÷ 50.

22.  
UPSC Prelims (CSAT) 2016

W can do 25% of a work in 30 days, X can do 1/4 of the work in 10 days, Y can do 40% of the work in 40 days and Z can do 1/3 of the work in 13 days. Who will complete the work first?

Correct Answer: D [Z]

Explanation:

The full-work times are W = 30 × 4 = 120 days, X = 10 × 4 = 40 days, Y = 40 × 2.5 = 100 days and Z = 13 × 3 = 39 days. So Z, at 39 days, finishes first, just ahead of X at 40 days.

23.  
UPSC Prelims (CSAT) 2020

A person X can complete 20% of work in 8 days and another person Y can complete 25% of the same work in 6 days. If they work together, in how many days will 40% of the work be completed?

Correct Answer: A [6]

Explanation:

X does 20% in 8 days, so the whole in 40 days; Y does 25% in 6 days, so the whole in 24 days. Together they do 1/40 + 1/24 = 1/15 a day, so 40% takes 0.4 × 15 = 6 days.

24.  
UPSC Prelims (CSAT) 2021

A man completes 7/8 of a job in 21 days. How many more days will it take him to finish the job if quantum of work is further increased by 50%?

Correct Answer: D [15]

Explanation:

7/8 of the job takes 21 days, so the full job takes 24 days, and 1.5 times the job takes 36 days. He needs 36 − 21 = 15 more days.

25.  
UPSC Prelims (CSAT) 2024

A certain number of men can complete a piece of work in 6k days, where k is a natural number. By what percent should the number of men be increased so that the work can be completed in 5k days?

Correct Answer: C [20%]

Explanation:

Men and days are inversely proportional for the same work, so the men needed change in the ratio 6k : 5k = 6 : 5. The increase is 1/5 of the original number, that is 20%.

26.  
UPSC Prelims (CSAT) 2013

In a garrison, there was food for 1000 soldiers for one month. After 10 days, 1000 more soldiers joined the garrison. How long would the soldiers be able to carry on with the remaining food?

Correct Answer: D [10 days]

Explanation:

After 10 days, the food left would last 1,000 soldiers for 20 more days, that is 20,000 soldier-days. With 2,000 soldiers it lasts 20,000 ÷ 2,000 = 10 days.

27.  
UPSC Prelims (CSAT) 2013

The tank-full petrol in Arun's motor-cycle lasts for 10 days. If he starts using 25% more everyday, how many days will the tank-full petrol last?

Correct Answer: D [8]

Explanation:

Using 25% more each day means 1.25 times the daily use, so the same tank lasts 10 ÷ 1.25 days. That equals 8 days, since time is inversely proportional to the rate of use.

28.  
UPSC Prelims (CSAT) 2016

There is an order of 19000 quantity of a particular product from a customer. The firm produces 1000 quantity of that product per day out of which 5% are unfit for sale. In how many days will the order be completed?

Correct Answer: C [20]

Explanation:

With 5% unfit, the saleable output is 95% of 1000 = 950 units per day. Days needed = 19,000 ÷ 950 = 20 days.

29.  
UPSC Prelims (CSAT) 2022

24 men and 12 women can do a piece of work in 30 days. In how many days can 12 men and 24 women do the same piece of work?

Correct Answer: D [Data is inadequate to draw any conclusion]

Explanation:

The total work is 24M + 12W per day for 30 days, but the efficiency of a man compared with a woman is not given. Without that ratio the time for 12 men and 24 women cannot be found, so the data is inadequate.

30.  
UPSC Prelims (CSAT) 2016

Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone?

Correct Answer: C [10 days]

Explanation:

Together they do 60% in 4 days, that is 15% a day; Shyam alone does the remaining 40% in 8 days, that is 5% a day. Ram's rate is 15% − 5% = 10% a day, so he needs 10 days alone.

31.  
UPSC Prelims (CSAT) 2017

P works thrice as fast as Q, whereas P and Q together can work four times as fast as R. If P, Q and R together work on a job, in what ratio should they share the earnings?

Correct Answer: A [3:1:1]

Explanation:

P = 3Q in rate, and P + Q = 4Q = 4R, so R = Q. Earnings are shared in the ratio of work rates, 3 : 1 : 1.

32.  
UPSC Prelims (CSAT) 2023

A, B, C working independently can do a piece of work in 8, 16 and 12 days respectively. A alone works on Monday, B alone works on Tuesday, C alone works on Wednesday; A alone, again works on Thursday and so on. Consider the following statements:

1. The work will be finished on Thursday.
2. The work will be finished in 10 days.

Which of the above statements is/are correct?

Correct Answer: A [1 only]

Explanation:

Taking the work as 48 units (LCM of 8, 16, 12), A, B and C do 6, 3 and 4 units a day, so each three-day cycle gives 13 units and 9 days give 39 units. Day 10 (A) brings it to 45 and day 11 (B) to 48, so the work ends on the 11th day, which is a Thursday; statement 1 is correct and statement 2 is wrong.

33.  
UPSC Prelims (CSAT) 2024

X, Y and Z can complete a piece of work individually in 6 hours, 8 hours and 8 hours respectively. However, only one person at a time can work in each hour and nobody can work for two consecutive hours. All are engaged to finish the work. What is the minimum amount of time that they will take to finish the work?

Correct Answer: C [6 hours 45 minutes]

Explanation:

X (1/6 per hour) cannot work two hours in a row, so the best order is X, Y, X, Z, X, Y, which does 3/6 + 3/8 = 7/8 of the work in 6 hours. X then does the last 1/8 in (1/8) ÷ (1/6) = 3/4 hour = 45 minutes, giving 6 hours 45 minutes.

34.  
UPSC Prelims (CSAT) 2011

A contract on construction job specifies a penalty for delay in completion of the work beyond a certain date is as follows: Rs. 200 for the first day, Rs. 250 for the second day, Rs. 300 for the third day etc., the penalty for each succeeding day being 50 more than that of the preceding day. How much penalty should the contractor pay if he delays the work by 10 days?

Correct Answer: B [Rs. 4250]

Explanation:

The daily penalties form an arithmetic progression 200, 250, 300, ..., so the 10th day's penalty is 200 + 9 × 50 = Rs. 650. Total = 10/2 × (200 + 650) = 5 × 850 = Rs. 4,250.

35.  
UPSC Prelims (CSAT) 2016

A class starts at 11:00 am and lasts till 2:27 pm. Four periods of equal duration are held during this interval. After every period, a rest of 5 minutes is given to the students. The exact duration of each period is:

Correct Answer: A [48 minutes]

Explanation:

From 11:00 am to 2:27 pm is 207 minutes, and the three rests between the four periods take 15 minutes. Each period is (207 − 15) ÷ 4 = 48 minutes; no rest is counted after the last period.

36.  
UPSC Prelims (CSAT) 2016

Four friends A, B, C and D need to cross a bridge. A maximum of two persons can cross it at a time. It is night and they just have one lamp. Persons that cross the bridge must carry the lamp to find the way. A pair must walk together at the speed of slower person. After crossing the bridge, the person having faster speed in the pair will return with the lamp each time to accompany another person in the group. Finally, the lamp has to be returned at the original place and the person who returns the lamp has to cross the bridge without lamp. The time taken by them is as follows: A: 1 minute, B: 2 minutes, C: 7 minutes and D: 10 minutes. What is the total minimum time required by all the friends to cross the bridge?

Correct Answer: A [23 minutes]

Explanation:

Under the given rules: A and B cross (2), A returns (1), A and C cross (7), A returns (1), A and D cross (10), then A brings the lamp back (1) and crosses without it (1). The total is 2 + 1 + 7 + 1 + 10 + 1 + 1 = 23 minutes.

37.  
UPSC Prelims (CSAT) 2025

A set (X) of 20 pipes can fill 70% of a tank in 14 minutes. Another set (Y) of 10 pipes fills 3/8th of the tank in 6 minutes. A third set (Z) of 16 pipes can empty half of the tank in 20 minutes. If half of the pipes of set X are closed and only half of the pipes of set Y are open, and all pipes of the set (Z) are open, then how long will it take to fill 50% of the tank?

Correct Answer: D [16 minutes]

Explanation:

Per pipe per minute: X fills 0.7 ÷ (20 × 14) = 1/400; Y fills 3/8 ÷ (10 × 6) = 1/160; Z empties 1/2 ÷ (16 × 20) = 1/640. Open now: 10 X, 5 Y, 16 Z, so the net rate is 10/400 + 5/160 − 16/640 = 1/40 + 1/32 − 1/40 = 1/32 of the tank a minute. Half the tank takes 16 minutes.

38.  
UPSC Prelims (CSAT) 2025

X can complete one-third of a certain work in 6 days, Y can complete one-third of the same work in 8 days and Z can complete three-fourth of the same work in 12 days. All of them work together for n days and then X and Z quit and Y alone finishes the remaining work in 8 2/3 days. What is n equal to?

Correct Answer: B [4]

Explanation:

X alone takes 18 days, Y 24 and Z 16 (three-fourths in 12). Together they do 1/18 + 1/24 + 1/16 = (8 + 6 + 9)/144 = 23/144 a day. Y alone in 26/3 days does 26/3 × 1/24 = 52/144. The rest, 92/144, took n days at 23/144 a day, so n = 4.

➤ Class X level methods, shortcuts with proof, worked solutions to UPSC CSAT numeracy PYQs and a reason for every option – U25 · CSAT Numeracy (UPSC book, ₹249): www.shanmugamiasacademy.in/study-materials/upsc-csat-numeracy

📘 U25 · CSAT – Basic Numeracy and Data Interpretation – UPSC Civil Services (Prelims Paper II – CSAT)