IBPS Clerk Quant – Time & Work, Pipes & Cisterns – Level 1 · Warm-up · Prelims Level – 11 questions, subject: Quantitative Aptitude. Every question has the correct answer with a two-line explanation; tap "Show Answer". Free practice for IBPS Clerk, IBPS PO, SBI, RRB exams – Shanmugam IAS Academy, Coimbatore.
Link to this page from your website / blog (HTML code)
Correct Answer: D [8 days]
Explanation:
Together they do 1/12 + 1/24 = 3/24 = 1/8 of the job per day. So they finish in 8 days, i.e. 12 × 24/(12 + 24) = 288/36 = 8.
Correct Answer: A [1/4]
Explanation:
Raju paints 1/6 of the wall per hour, and 1 hour 30 minutes = 1.5 hours. So he paints 1.5 × 1/6 = 1/4 of the wall.
Correct Answer: C [5 days]
Explanation:
20% means 1/5 of the job each day. So the whole job takes 100 ÷ 20 = 5 days.
Correct Answer: B [18]
Explanation:
The wall needs 12 × 15 = 180 man-days. To finish in 10 days, 180 ÷ 10 = 18 men are needed.
Correct Answer: C [22.5 hours]
Explanation:
The net filling rate is 1/9 − 1/15 = (5 − 3)/45 = 2/45 of the tank per hour. So the tank fills in 45/2 = 22.5 hours; the outlet rate is subtracted, not added.
Correct Answer: B [True]
Explanation:
Time is inversely proportional to efficiency, so if efficiencies are 2 : 1, times are 1 : 2. Hence A takes half of B's time for the same work, whatever the size of the job.
Correct Answer: D [30 days]
Explanation:
B's rate = 1/12 − 1/20 = (5 − 3)/60 = 1/30 of the job per day. So B alone takes 30 days (same as 20 × 12/(20 − 12) = 30).
Correct Answer: A [72]
Explanation:
8 workers × 9 days = 72 worker-days of work. One worker alone therefore needs 72 days (fewer workers need proportionally more days).
Correct Answer: A [8 and 20 days]
Explanation:
8 and 20 days together give 8 × 20/(8 + 20) = 160/28 = 5 5/7 days, not 6. The other pairs give exactly 6 days: 9 × 18/27 = 6, 10 × 15/25 = 6 and 12 × 12/24 = 6.
Correct Answer: B [i-r, ii-p, iii-q, iv-s]
Explanation:
Work done per day = 100% ÷ days: 8 days → 12.5%, 20 days → 5%, 4 days → 25% and 6 days → 16 2/3%. This matches i-r, ii-p, iii-q, iv-s.
Correct Answer: D [12 minutes]
Explanation:
Together they fill 1/20 + 1/30 = 5/60 = 1/12 of the tank per minute, so the tank fills in 12 minutes. Shortcut: xy/(x + y) = 600/50 = 12.
நடப்பு நிகழ்வுகள் 24 நவம்பர் 2026 | Today Current Affairs in Tamil | TNPSC Group 4 வினா விடை
📚 IBPS Clerk 2026 Books
PDF நூல்கள் · ₹149 முதல் · ஒவ்வொன்றுக்கும் 50 பக்க இலவச மாதிரி · UPI-இல் பணம் செலுத்தியதும் உடனே பதிவிறக்கம்
IBPS Clerk 2026 – Complete Set (5 Books, Prelims + Mains)
₹599
IBPS Clerk 2026 – Quantitative Aptitude (Prelims + Mains)
₹149
IBPS Clerk 2026 – Reasoning Ability (Prelims + Mains)
₹149
IBPS Clerk 2026 – English Language (Prelims + Mains)
₹149TNPSC குரூப் 1, 2/2A, 4 – நேரடி வகுப்புகள் · கோவை & மதுரை
2006 முதல் சண்முகம் IAS அகாடமி · Classroom & online coaching in Coimbatore and Madurai