IBPS Clerk Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge · Prelims Level

← Back

IBPS Clerk Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge · Prelims Level – 9 questions, subject: Quantitative Aptitude. Every question has the correct answer with a two-line explanation; tap "Show Answer". Free practice for IBPS Clerk, IBPS PO, SBI, RRB exams – Shanmugam IAS Academy, Coimbatore.

Get daily current affairs & exam alerts – follow us YouTube WhatsApp Channel Telegram Channel Facebook Page Instagram
Share with friends & study groups
Link to this page from your website / blog (HTML code)
1.  
A and B together can do a job in 12 days. A works on it for 4 days and then B alone finishes the rest in 18 days. B alone can do the whole job in:

Correct Answer: C [21 days]

Explanation:

A's 4 days plus B's 18 days equal 4 days of (A + B) plus 14 more days of B. Since 4 days of A + B do 4/12 = 1/3, B's 14 days do 2/3, so B alone takes 14 × 3/2 = 21 days.

2.  
10 men can finish a job in 12 days, and 15 women can finish it in 16 days. In how many days will 5 men and 6 women finish it?

Correct Answer: A [15 days]

Explanation:

One man does 1/(10 × 12) = 1/120 and one woman 1/(15 × 16) = 1/240 of the job per day. 5 men and 6 women do 10/240 + 6/240 = 16/240 = 1/15 per day, so they finish in 15 days.

3.  
Pipes A and B can fill a tank in 20 and 30 minutes; pipe C can empty it in 15 minutes. A and B are opened together in the empty tank, and after 6 minutes C is also opened. In how many minutes in all is the tank full?

Correct Answer: E [36 minutes]

Explanation:

LCM 60: A 3, B 2, C −4. 6 min → 30 units; then net 1 unit/min → 30 more minutes; total 36.

4.  
A is three times as efficient as B and takes 40 days less than B to finish a job. In how many days can they finish it together?

Correct Answer: B [15 days]

Explanation:

Being three times as efficient, A takes one-third of B's time, so B − A = 2 parts = 40 days, giving A = 20 and B = 60 days. Together they take 20 × 60/(20 + 60) = 15 days.

5.  
A can do a job in 20 days and B in 30 days. They start together, but A leaves 5 days before the job is finished. The job is finished in:

Correct Answer: D [15 days]

Explanation:

Take the job as 60 units: A does 3 and B 2 units/day. If the job takes T days, A works T − 5 days, so 3(T − 5) + 2T = 60, giving 5T = 75 and T = 15 days.

6.  
A can do a job in 6 days and B in 8 days. With the help of C they finish it in 3 days and are paid ₹ 3,200. C's share is:

Correct Answer: C [₹ 400]

Explanation:

In 3 days A does 3/6 = 1/2 and B does 3/8 of the job, so C did 1 − 1/2 − 3/8 = 1/8. Wages follow work done, so C gets 1/8 × ₹ 3,200 = ₹ 400.

7.  
12 men can complete a job in 18 days. After they have worked for 6 days, 4 more men join them. In how many more days is the job finished?

Correct Answer: A [9 days]

Explanation:

The job is 12 × 18 = 216 man-days, and 12 × 6 = 72 man-days are done in the first 6 days. The remaining 144 man-days with 16 men take 144 ÷ 16 = 9 more days.

8.  
A and B can do a job in 18 days, B and C in 24 days, and A and C in 36 days. How many days will C alone take?

Correct Answer: B [144 days]

Explanation:

With the job as 72 units, A + B = 4, B + C = 3 and A + C = 2 units/day, so 2(A + B + C) = 9 and A + B + C = 4.5. Then C = 4.5 − 4 = 0.5 unit/day, so C alone takes 72 ÷ 0.5 = 144 days.

9.  
Spot My Mistake: "A fills a tank in 10 h, B in 15 h, and a leak empties it in 30 h. (1) LCM = 30 units. (2) A = 3, B = 2, leak = 1 unit/h. (3) Net = 3 + 2 + 1 = 6 units/h. (4) Time = 30 ÷ 6 = 5 h." Which step is wrong, and what is the correct time?

Correct Answer: C [Step (3); 7.5 h]

Explanation:

Step (3) is wrong because a leak removes water, so its rate must be subtracted: 3 + 2 − 1 = 4 units/h. The correct time is 30 ÷ 4 = 7.5 hours.

📘 IBPS Clerk 2026 – B2 Quantitative Aptitude (PDF book)
Here you get the answer with a one-line explanation. 842 questions, each with a full step-by-step explanation · shortcuts, tables, trap alerts · Prelims + Mains sectional mocks. All 5 books together: ₹599.
Get the book – ₹149 →
Score: 0 Answered: 0 / 0