IBPS Clerk Quant – Time & Work, Pipes & Cisterns – Level 3 · Challenge · Prelims Level – 9 questions, subject: Quantitative Aptitude. Every question has the correct answer with a two-line explanation; tap "Show Answer". Free practice for IBPS Clerk, IBPS PO, SBI, RRB exams – Shanmugam IAS Academy, Coimbatore.
Link to this page from your website / blog (HTML code)
Correct Answer: C [21 days]
Explanation:
A's 4 days plus B's 18 days equal 4 days of (A + B) plus 14 more days of B. Since 4 days of A + B do 4/12 = 1/3, B's 14 days do 2/3, so B alone takes 14 × 3/2 = 21 days.
Correct Answer: A [15 days]
Explanation:
One man does 1/(10 × 12) = 1/120 and one woman 1/(15 × 16) = 1/240 of the job per day. 5 men and 6 women do 10/240 + 6/240 = 16/240 = 1/15 per day, so they finish in 15 days.
Correct Answer: E [36 minutes]
Explanation:
LCM 60: A 3, B 2, C −4. 6 min → 30 units; then net 1 unit/min → 30 more minutes; total 36.
Correct Answer: B [15 days]
Explanation:
Being three times as efficient, A takes one-third of B's time, so B − A = 2 parts = 40 days, giving A = 20 and B = 60 days. Together they take 20 × 60/(20 + 60) = 15 days.
Correct Answer: D [15 days]
Explanation:
Take the job as 60 units: A does 3 and B 2 units/day. If the job takes T days, A works T − 5 days, so 3(T − 5) + 2T = 60, giving 5T = 75 and T = 15 days.
Correct Answer: C [₹ 400]
Explanation:
In 3 days A does 3/6 = 1/2 and B does 3/8 of the job, so C did 1 − 1/2 − 3/8 = 1/8. Wages follow work done, so C gets 1/8 × ₹ 3,200 = ₹ 400.
Correct Answer: A [9 days]
Explanation:
The job is 12 × 18 = 216 man-days, and 12 × 6 = 72 man-days are done in the first 6 days. The remaining 144 man-days with 16 men take 144 ÷ 16 = 9 more days.
Correct Answer: B [144 days]
Explanation:
With the job as 72 units, A + B = 4, B + C = 3 and A + C = 2 units/day, so 2(A + B + C) = 9 and A + B + C = 4.5. Then C = 4.5 − 4 = 0.5 unit/day, so C alone takes 72 ÷ 0.5 = 144 days.
Correct Answer: C [Step (3); 7.5 h]
Explanation:
Step (3) is wrong because a leak removes water, so its rate must be subtracted: 3 + 2 − 1 = 4 units/h. The correct time is 30 ÷ 4 = 7.5 hours.
நடப்பு நிகழ்வுகள் 24 நவம்பர் 2026 | Today Current Affairs in Tamil | TNPSC Group 4 வினா விடை
📚 IBPS Clerk 2026 Books
PDF நூல்கள் · ₹149 முதல் · ஒவ்வொன்றுக்கும் 50 பக்க இலவச மாதிரி · UPI-இல் பணம் செலுத்தியதும் உடனே பதிவிறக்கம்
IBPS Clerk 2026 – Complete Set (5 Books, Prelims + Mains)
₹599
IBPS Clerk 2026 – Quantitative Aptitude (Prelims + Mains)
₹149
IBPS Clerk 2026 – Reasoning Ability (Prelims + Mains)
₹149
IBPS Clerk 2026 – English Language (Prelims + Mains)
₹149TNPSC குரூப் 1, 2/2A, 4 – நேரடி வகுப்புகள் · கோவை & மதுரை
2006 முதல் சண்முகம் IAS அகாடமி · Classroom & online coaching in Coimbatore and Madurai